The first set of ETFE roof panels have been installed at Allegiant Stadium, marking the start of the final process of the structure being fully enclosed. The roof is designed to give the stadium an outdoor feel on day games, as the games will be naturally lighted, in the comfort of a temperature-controlled facility. The entire installation process is expected to last through May.
0 Comments